What this means for Northern BC strata councils
This guide covers epr vs depreciation report for strata corporations across Northern BC. The requirements are province-wide, but two things are local to your council — the deadline you are working toward and the kind of building you manage.
Northern BC — Prince George, Fort St. John, Dawson Creek, Terrace, Kitimat, and Prince Rupert — has a smaller strata footprint than the southern half of the province but distinctive building stock: 1970s industrial-expansion era wood-frame walk-ups in Kitimat and Prince Rupert, 1980s walk-ups in central Prince George, and townhouse-dominant inventory through the Peace River municipalities.
- Electrical Planning Report (EPR): due December 31, 2028 for Northern BC stratas of five or more lots, under the Strata Property Act.
- Depreciation Report: due July 1, 2027 if the strata has never had a report or its most recent report predates December 31, 2020.
The full guide
No — the Electrical Planning Report is not the same as the Depreciation Report. They are two separate statutory requirements under BC strata law, prepared as separate documents with separate deadlines. Councils routinely mix them up because both come due within a couple of years of each other — but they answer different questions.
The Electrical Planning Report answers a capacity question
The EPR is about electricity: how much load the building's electrical service can carry, what is constraining it, and what electrification (EV charging, heat pumps, electric hot water) will require. It is due by December 31, 2026 for stratas in Metro Vancouver, the Fraser Valley, and the Capital Regional District, and by December 31, 2028 elsewhere in BC.
The Depreciation Report answers a financial question
The Depreciation Report projects the cost of repairing and replacing common property and assets over a 30-year horizon and translates that into a contingency reserve fund plan. It was due by July 1, 2026 in Metro Vancouver, the Fraser Valley, and the Capital Regional District — a deadline that has now passed — and is due by July 1, 2027 in the rest of BC, for stratas that have never had one or whose most recent report predates December 31, 2020. It then renews on a five-year cycle.
Why they belong together
The two reports share inputs. The electrical service condition and the capital-renewal picture that an EPR surfaces feed directly into a credible Depreciation Report — an electrical upgrade the EPR recommends is exactly the kind of future cost a reserve fund needs to anticipate. Commissioning both together keeps a building's electrical and financial planning consistent and avoids duplicate site work.
Same Qualified Persons
Both reports are prepared by a Qualified Person under BC strata law. For an EPR that is a P.Eng, P.L.Eng., AScT, or Certified Technician (Part 3 buildings) or a Journeyperson Electrician (Part 9 buildings); a Depreciation Report uses the same P.Eng, P.L.Eng., AScT, or Certified Technician credentials. CF Electrical Services prepares both.
Next steps for Northern BC councils
When your council is ready to act, CF Electrical Services prepares Electrical Planning Reports, EV Ready Plans, and Depreciation Reports for stratas across Northern BC — the statutory reports signed and sealed by the credential the regulation calls for, and everything written in plain language for the council and owners who have to use it. When the plan becomes a project, we can manage that too.
- Electrical Planning Reports in Prince George
- Electrical Planning Reports in Fort St. John
- Electrical Planning Reports in Dawson Creek
- Electrical Planning Reports in Terrace
- Electrical Planning Reports in Kitimat
- Electrical Planning Reports in Prince Rupert
- Electrical Planning Reports in Mackenzie
- Electrical Planning Reports in McBride
See all Northern BC strata services, or browse the full guide library.
Written by CF Electrical Services — BC strata electrical consulting: Electrical Planning Reports, EV Ready Plans, and electrification project management, plus Depreciation Reports. Published June 4, 2026.